hello,
Is it possible to save the saiku report in required form with a date parameter set to something like (date.previous date)
and automated it by scheduling to run daily at 0700hours and mail to particular team
i can save a report but don't know how to pass a parameter
or else how can i use this to create a prpt report and schedule it as above
i am unable to set a Mondrian schema file as datasource
guidance in this would be really appreciated
Is it possible to save the saiku report in required form with a date parameter set to something like (date.previous date)
and automated it by scheduling to run daily at 0700hours and mail to particular team
i can save a report but don't know how to pass a parameter
or else how can i use this to create a prpt report and schedule it as above
i am unable to set a Mondrian schema file as datasource
guidance in this would be really appreciated